Residents of Cuarataquiche, Naricual parish of the Bolívar municipality in Anzoátegui state, received the remodeled facilities of the Popular Clinic Type III (CPTIII), with trained personnel and a fully equipped ambulance.
With this new vehicle, the municipality now has 12 active ambulances for emergency care, as part of the strengthening of the regional health network promoted by all levels of government.
Governor Luis José Marcano, along with Mayor Sugey Herrera, detailed that since 2022, the Governor's Office has invested $3.7 million in the purchase of more than 50 ambulances and $1.7 million in the maintenance of the emergency vehicle network, a figure that represents 3% of the total resources managed by the state executive in that period.
Improved clinic
The regional leaders made the delivery and toured the facilities of the health center, which has a direct impact on nearly 600 families.
They explained to the community and staff the work carried out at this community clinic, which included the installation of air conditioning, repainting, roof repairs, placement of lighting fixtures, and provision of new medical furniture.
The mayor of Barcelona emphasized that the center provides 24-hour care and offers general medical consultations, nursing services, and immunization for all residents of the Vencedores de Mi Patria Productive Commune.
He said that a parking lot will be built for the new ambulance, so sheets of corrugated metal, structural tubes, cement, washed sand, crushed stone and electro-welded mesh were delivered.
Water service improvements
During the visit to Curataquiche, the governor and the mayor inspected the delivery of pipes, hoses, connections and a water pump intended to optimize the drinking water distribution network in the town.
These teams were financed by the Barcelona City Council after being the second most voted project by the community in the last National Popular Consultation, directly benefiting 585 families.
The delivery includes 500 meters of 3-inch hose, a 15 HP submersible pump, 24 meters of high-pressure pipes, and an electrical panel.
Additionally, community public service crews received tool kits to strengthen daily cleaning and weeding work in the Curataquiche sectors.










