HomeLifeInstallation of new water pipeline begins in El Encantado

Installation of new water pipeline begins in El Encantado

The works are part of the comprehensive rehabilitation of the Tuy II System

This Monday the welding process of the first 24 linear meters of 100-inch pipe began in the El Encantado sector, El Hatillo municipality, reported a press release from the Miranda government.

The works are part of the comprehensive rehabilitation of the Tuy II System and are carried out by specialized personnel from Hidrocapital, with the support of the Government of Miranda.

Operators specialized in welding from the state company carry out the work to optimize the supply of drinking water in the metropolitan region.

Simultaneously, Hidrocapital repaired a breakdown in a 42-inch pipe in the Lomas del Ávila sector, Sucre municipality, work that will benefit 45.000 families in the metropolitan jurisdiction, with the supply of 10 liters per second of drinking water.

The correction of the leak in the pipeline was carried out after residents of the community reported the news to the competent entities through the VenApp application and with the 1×10 Good Government system.

Leave a response

Please enter your comment!
Please enter your name here