They install a 50 KVA transformer to benefit families from Caricuao

They will benefit more than 80 families from this Caracas parish

Workers of the National Electric Corporation (Corpoelec) installed a new 50 KVA transformer in the La Sidra neighborhood of the Ruiz Pineda sector, Caricuao parish in Caracas.

The location of the single-phase transformer was carried out to benefit more than 80 families in this Caracas parish, says a press release.

The work, carried out by the staff of the La Yaguara Service Center, had the support of the beneficiary community, complying with the biosecurity measures against COVID-19.

Corpoelec keeps its crews active to serve the National Electric System (SEN), in compliance with the instructions of the President of the Republic, Nicolás Maduro; the Minister of Popular Power for Electric Energy, G / J Néstor Reverol, and the president of the Corporation, José Luis Betancourt. / VTV

 

SPONSORED LINKS

				
					<div class="fb-comments" data-href="<?php the_permalink(); ?>" data-width="100%" data-numposts="5">&nbsp;</div>
				
			
WP Twitter Auto Publish Powered By: XYZScripts.com