The Caracas Metro reiterated the contingency plan for the Metrobús between Petare and Mariches, given the work being carried out in the Metro Cable Mariche System, and which keeps the service suspended until October 30 of this year.
Through its official Twitter account, the Vice President of the Public Works and Services Sector emphasized that "Cable Systems workers continue working at the Mariches Cable Metro," where they are lowering the tractor cable and beginning the retention process to cut the wire rope.
In another tweet from @metro_caracas, it was written: "Due to the #HighImpact works being carried out on the #MetroCableMariche, a contingency route is active through Surface Transportation #Metrobús for the efficient transportation of the #Mariche user population."
It should be noted that the Metro Cable Mariches began its operations on December 10, 2012, as part of the second line of this project that covered the section between the Mariche and Palo Verde II stations, connecting with the Palo Verde station of the Metro system. from Caracas.




