The mayor of the Libertador municipality, Carmen Meléndez, announced via her Instagram account that the reconstruction of the Élite Building, located in the San Bernardino parish of Caracas, is 96% complete. The structure suffered severe damage following the two earthquakes that struck on June 24th.
The building, which was previously inspected by President Delcy Rodríguez following the earthquakes, has undergone a comprehensive restoration by intervention teams. The work has included the reconstruction, reinforcement, and painting of interior walls and facades, as well as the upgrading and optimization of the direct gas system, roof waterproofing, and general repairs in common areas.
According to the report presented, the Elite Building consists of a total of 60 apartments, of which 57 were damaged by the seismic activity and 28 are currently undergoing internal renovation to ensure optimal living conditions for their residents.
"As the implementing body of the Venezuela Renace Plan, we continue to rebuild buildings through our 171 work fronts," he concluded.
A new building
The posted video shows testimonials from the building's residents. Some apartments were demolished in a controlled manner, with 90% of them partially demolished, to make way for the intervention.
Currently, it is in the final phase of reconstruction and, according to statements from the residents, they are looking at a "completely new building".




