Caracas – Valles del Tuy railway system resumes service after catenary repair
#Miranda The system resumes operations with 10 trains in circulation and waiting times of 10 to 12 minutes.
The Rangel River overflows, affecting more than 20 houses in Ocumare
#Miranda 33 power outages and flooding were reported in the industrial zone
They clear the main pipeline of the La Guamita intake in Ocumare del Tuy
#Miranda Efforts underway to restore water supply after collapse caused by heavy rains
Transfer service activated in Charallave Norte due to power outage
#Miranda Three double-composition trains guarantee mobility between Caracas and Cúa
The Tuy Valley Train runs every 20 minutes
#Miranda Activated Temporary Single Track (VUT) number 1 while the definitive repair work on the overhead power line continues



